Infrastructure Upgrades
Final constructed water tank with added height and head pressure.
Tank prior to lifting and adding additional length to the tank.
Existing tank being lifted and new structural steel added.
Water tank lifting in progress
Water tank structure lifted to add additional steel framing and panels.
Lifted to final height. New steel and panels to install.
Hydraulic lifting devices used to lift the tank to its final desired height.
Hydraulic devices shown and structural framing.
Final tank construction in it's glory.
New sewage lift station
Lift station pump controls and electric panel work.
New sewage Lift Station Influent chambers and pumps
New Lift Station Po Valley Road, Fort Drum
Lift station pump and electric panel work
Sewage lift station Po Valley Fort Drum, NY
Project Description
Upgrade the sewer and water systems to include raising a 1 million gallon water tank, installation of 9 water pressure reducing facilities, two sewer lift stations and 3000 feet of new sewer line installation. Installed over 3 miles of fiber optic cable.
-
Project Information
Client: USACE NY District
Location: Fort Drum, NY
Contract Award: $10,788,000
Construction Type: Design Build