AIR AMBULANCE HANGAR
GALBREATH HALL RENO
Hospital Addition and Interior Renovation
Reno of S. Jeff
Electrical Upgrades
Hospital HVAC Reno
Road Construction
Storm Water Improvements
Chaney Dining Hall Reno
Building Renovation for the NAVFAC to include complete interior renovation of finishes, electrical and HVAC. This is a highly classified area and no photos are permitted.
Hangar for Unmanned Aircraft
School Renovation to include new parking lot, new resurfacing of parking lot, baseball field improvements, nature trail, interior and exterior improvements
Design build Administration Bldg and Concrete Ammo bunkers
Training Center and Warehouse for Soldiers Training Activities
SUNY Brockport ADA compliant Pedestrian Foot Bridge
Missile Interceptor Communication System Data Terminal
Naval Operational Center Repair
This project was a design build project for the USACE at Fort Drum, NY
This project was awarded under as an 8A contract. Project entailed repair/renovation of the major facilities and infrastructure to include a. Buildings: Reserve Training Building, Reserve Training Building Armory, Combat
Upgrade the sewer and water systems to include raising a 1 million gallon water tank, installation of 9 water pressure reducing facilities, two sewer lift stations and 3000 feet of new sewer line installation. Installed
This was a design build project of a 25,000 SF child development center for school age children (0-5 years). The project consisted of classrooms, commercial kitchen, complete playground facilities,
Project included the rehabilitation and renovation of the light house station including concrete brick repair, repair of the existing railing system and erection of new pipe railings.
Work includes renovation of existing classroom areas, hallways and bathrooms. New walls and drywall, tile, ceilings, lockers, insulation, masonry restoration and casework in classrooms.
This was project awarded to BHG under an 8A contract. The repair and renovation of facilities to include a Training Center, Garage, Vehicle Maintenance Facility and infrastructure. Work included roof replacement, masonry