Reaper Bed Down Project


Project Description

Construction of new hangar 13,000 SF for unmanned aircraft.  Project included 15 acre of site clearing and grubbing, installation of storm water system,  5280 feet of gravel tow road,  concrete hardstand, site utilities to include water, sewer, gas.  Building included pre-engineered building frame, insulated metal panels, standing seam metal roof,  solar wall, new HVAC system, fire sprinkler, fire alarm, mass notification,

  • Project Information